Tuesday, October 19, 2010

10 Exhibition-Dymaxion

It's art craft time!!We were required to build a huge dymaxion with 20 faces with our assignment photo on the surface.So,i manage to get 2 pieces of card board and i combine these 2 card board to made a dymaxion.

Intention:produce a dymaxion with photo on the surface.
Actor:Me
Rules:knee height dymaxion with innovative installation,attractive montage and communication.

Act:
Firstly,i photostat the paper with the shape of dymaxion when open where cost RM6.So i shared with my 3 friends and we take turn to use it.


I traced the behind the paper with 8B pencil as shown below:

I put the 2 card board on bottom and the paper on top of it.


Started to trace the pattern using pen and ruler.




Here was the product after i traced the paper.


Then,i cut down the shape using scissor.


Here was the product where it place nicely on the floor.


On the next day,i fold the card board according to line i traced.


Then,i combine all the opening according to their 'active site'.


To ensure that the dymaxion was shaped without lose,i put double cellophane tape on it when combine all the opening.


Hopefully the dymaxion was firm and stable after i stick all the side with double cellophane tape.



The dymaxion was done!Here was the product!


Dymaxion with knee height:


I printed out all the assignment image that influence me a lot and meaningful to me which was about 20 pieces of A4 paper.Then,i stick the images on the surface of dymaxion randomly.


Dymaxion with images on top of it surface:


In decoration part,i draw the love shape on colour paper and cut it.


Love,love,love.....


Then,i paste it around the dymaxion randomly.


The final product!




Feel happy when completed dymaxion and pose with it...


My dymaxion with her friends...


They will be display at a place when exhibition that fall on 25 October.

Monday, October 18, 2010

9 Conference-Soul Shift

We are fast asleep in a box and we have too much dreaming. You feel “awake” in your dreams and with practice you can learn to control them. Dreams have no limits. You can travel to other countries, talk with historical figures or your spirit guides, and do things you can’t in your waking life.


The sub-topic of quantity surveying is spread factual to the world.After collaboration with our studio master,my group title include cost estimate,management skill and responsibility.

Our intention:Spread Factual to the World!

The actors:

MUHAMMAD HARIZ BIN MOHD RADZI

SYAFIQ IKHWAN BIN KAMARUDIN

TAN SYNTZE

TEO SIN YEE

WEE ENG SING



Here's my 1500 words about spread factual to the world in quantity surveying:

Spread the factual info to the world. Is it possible for the Quantity Surveyor to expose all the detail financing, management detail and etc. to the world to throw away the paradigm that the QS always involve in corruption and bride. There are differences scopes of view and as QS, we need to make a transition or many people always said the transformation. The mind shift or the soul shift or the paradigm shift should be created in order for the QS to escape from the bad paradigm.

As a professional quantity surveyor, we need to evaluate the price of materials. We can estimate the cost of materials through tender document. We need to consider about the quality and prices of the materials in the market whether it is valuable. Then, we can consult our clients and recommend them the precious composition. It is better to choose the materials that are in good quality although the prices are slightly different. We have to know that as the materials that in use is high quality we can save in the maintenance cost. On the other way, the maintenance cost will be high if the materials that used in construction is low. Furthermore, we need to re-evaluate the salary is being pay to the contractor at the correct amount and period. This is to ensure the efficiency of work. If they are being pay under the amount that they expected, they might felt that their hard work are not worth for that. Thus they will become lazy for the next construction work or else just carelessly help you to done the work. Same as when they are being pay more. We need to give the reasonable reason so that they wont feel any uncomfortable. For example as a bonus when they work during some kind of festivals. Most important is that we have to ensure that the project does not run over budget or beyond the contracted time frame as this could lead to damages being sought on behalf of the owner. Construction arbitration enables comparative evaluation of the performance of a project over its operating life. The life cycle costing evaluation considers factors like reusability, sustainability, maintainability, and aspects of the constructed facility. It also assesses the maintenance costs, initial capital costs, operational costs, and residual and disposal costs. We may also give suggestions on procurement methods like selecting the right kinds of contractors and suppliers. We also provide suggestions on tendering, give contractual advice, and do valuation of construction work. Clients can expect to cost control and financial management and seek insurance advice from our quantity surveyor

One of the roles of a quantity surveyor is to estimating, control and manages the costing of a construction project. This would include the new builds, renovations or maintenance work. From easily design costs to final figures, quantity surveyor seek to minimize the cost of the project and enhance value of money whilst ensuring that the project meets all legal quantity assurance requirements. The document tender involving the expense should be reliable and trustworthy according to the provision in the Law of Construction. Trustworthy, honest and have good communication as well as presentation skill is the basis principle should be underlie for a QS. Quantity surveyor also council the project director, owner and contractor on cost and budget to keep the pricing as well as the time frames, reasonable for all parties involved. They ensure all the work is complete within the building standard. Apart from that, quantity surveyor’s duties related to the costing typically include conducting feasibility studies to estimate materials, time and labour cost. Secondly preparing negotiating and analyzing cost for tender and contract and also valuing complete work and arrangement payment. Other than that, quantity surveyor require to familiar with specific for buildings, health concern and safety regulation. This person is also very thorough, pay attention in detail and quick problem solver. A quantity surveyor should has the ability to find the solution to overcome the consequent carved by the increase of price of the materials during the construction work progressing. Overall, the truth must be exerted by a QS as this is a very sensitive issue in the aspect of economic, politic and social. In this era, the world is full of the falsehood, some of the peoples are willing betray their own principle in order to take their own advantage because the insatiable attitude. I think this is easily happen among the firm related with construction. Corruption, cheated happen will bring a big consequence to the social for example building collapse that would sacrifice thousands of human life and properties. Hence, the mind shift should be emphasized to rectify the work ethic of quantity surveyor.

As a professional surveyor, we must show good behavior towards all people. It is not to say hypocritical, but we must act as a professional. As a professional surveyor, we should spread the info that fact, true and correct to the entire world. If we heard the latest news, most surveyors have been doing such despicable acts like corruption and so on. As a one of a professional surveyor, we should avoid these activities. In the sense of leadership, a surveyor must lead to a job as possible. Leadership in terms of fairness should be applied within a surveyor. Honesty in their work will result in quality as well. Not only the surveyor, but every human act must be applied with a good nature for the welfare of mankind. Surveyor must also apply the value of leadership in disseminating the correct information and facts to the world. A surveyor must be confident that each works for all our actions will affect everyone who deals with a surveyor. If we are dealing with good and full of leadership, clients will be interested and would often give us the opportunity to work. With this will definitely improve the quality of our work that is very challenging indeed. We all believe that every religion forbids us as guilty of corruption deceit and so, so, the blessings will be accessible to all people if we are obedient and do what is right in our lives. A surveyor also must always be alert to the fluctuating prices of construction equipment as if we were so engrossed, would be one in the costs calculations. So, a surveyor must apply the leadership in spread factual info to the world and the moral values such as honesty, sensitivity and others to solve a task to get the blessings of life.

Quantity surveying is all about cost management of construction. Thus, management skill and responsibility is needed when working as quantity surveyor. Quantity Surveyor primarily assesses the capital expenditure of a building or a facility after evaluating the feasibility, design and construction costs. In order to master management skill in quantity surveying field, quantity surveyor need to undergo multi-level of learning started with basic skill. The scope of work of a quantity surveyor is vast since the construction industry is global in nature. So, several of interpersonal skills are needed in order to deal with different situation. The first level of management skill is basic skills. There are four basic management skills which are plan, organize, direct and control. Quantity surveyor need to plan strategic on what they need to be done first because they have to work under pressure of deadlines near and staying claim. The second basic skill is organized a tasks and construction project. Quantity surveyor have to provide site support in matters like billing schedule, interim payments, and reconciling final accounts as well as settling construction claims. So, all the works have to be organize to get better results. Besides, they also should direct and control expenditure of the project during its entire life period.

The second level of management skill is team building skills. In construction field, all people have to work as a team to bring success in construction project. Quantity surveyors have to be professional in conduct and competence. So, they have to motivate each member in construction project especially in cost management of construction and finance management. When working as a team, everyone have to responsible and accountable for their action. Next, the third level of management skills is personal development. It divided into two types which is self-management and time management. In self-management, quantity surveyor have to do their job best and stay focused that are truly important and not just urgent especially when they managing contractual document with suppliers of various items. They have to stay focused because quantity surveyor needs to have good attention to detail. Time management is very important when quantity surveyor have to done their work before deadlines. Lastly, the top level is leadership. Quantity surveyor have to advise clients about the cost of construction project. Leadership is clearly shown when they negotiating with interested parties and relating to people from different sprata.

There are many steps and path in designing the building until to the construction of the building. A lot of work to do and sometimes there are many obstacles to complete it. Construction industries may involve many people and a lot money on it. As a quantity surveyor, we should take these responsibilities as honour as we can. Nowadays, there are many news about the building damage because of the material use are not in quality. Is it the surveyor especially quantity surveyor responsibility? As a qualified and registered QS, we should take care of such thing. Many people said that Qs involving in the corruption of money and bride. These paradigm has been talking for a long time and these thought should be change as a responsibilities of QS to calculate and survey cost management of construction. We need to spread the entire fact and the new paradigm to the world. The QS should show the good ethics in work and transparent, trust and truthful in work. By monitoring the all the detail in the construction industries, surely all the financial of the industries will just right and all the project will run smoothly. If the Quantity Surveyor play their role as good as they can, surely the economic of the country will be maybe slightly change to be better because all the money provided are being used in such a truth and honour calculative .

Besides,we also produce a poster using computer:

In quantity surveying field,the most important thing is to be sincerely to ourself.The material used in contruction must not be less because of saving cost.Safety is the most important thing because it include life of people that stay inside the building and they are innocent.

Monday, October 4, 2010

FAQ Session of LOMPATAN APEX KE 2012

Today was the BIG day for all USM lectures and students.The discussion was about APEX Bamboo Pole Vaulting to 2012.The discussion started at 0900 in E48B which was school for HBP first year students.


Lecture WanB given the talk about the potentiol of bamboo and how BIG would contribute to 2012.


Lompatan APEX ke 2012 need co-operation of all people but not just USMmembers.Mr WanB describe that the events of BIG was like a seed that involved contribution of all the people in USM.



After half of the talk,Mahram came in and given a talk about herself after she study in USM and what she has experience here.



She has experience many new things and HBP had give her a great chance to discover herself and others.For me,i had the same feeling as her.Nothing is impossible when we haven try on it.In HBP,all things that seems impossible become possible after we experience ourself and after we happy about our results.




The discussion had started and one of the lecture was curious about the population and plantation of bamboo.This was the first time he saw so many bamboo and was worry about the decreasing of bamboo population if we use bamboo as development.



WanB answer his question by saying that bamboo plantation can be done by all people using just hands and will not be used up in short time.It can grow very fast.Besides,palm oil also can reserved bamboo.Other than development,we also can do some research on bamboo so that we can bring benefits to next generation.




Next lectures was asking about how BIG can contribute to APEX journey.



Mr WanB said that the system for example co-curriculum should be changed and more USM students should committed to BIG.We can pull all resources together to save people,place and rule of the world.We as a students should play our part in BIG and bring peaceful to the world.




Next was the question raised by HBP students,Grace.She asked that what was the uses of IBU if 2012 is not flood but other disaster for example earthquake and volcanoes.

WanB answer that other than floating houses in Holland,South Afrika also had teach Indonesian how to prevent earthquake.We should get help from all the research to apply on the development before the disaster.He also mention that learn outside the class can help students to learn more and be more creativity other than study in class by just memorising words.



The next student Muhammad asked that can bamboo generate energy like other resources.

WanB said that anything can turn into energy if we seek help from people and think that is it suitable and sustainable.

Siew Bee raised a question about how long can the bamboo live with or without preservation.WanB answer that we still not so sure about the lifespan of bamboo so more research should be done on bamboo to discover it's potential.

The last question was asked by Yvonne on how the bamboo can contribute in medicine other than in building construction.Due to Mr WanB knowledge,it can treat epilepsy.



The discussion was ended and all of us had better understanding about BIG and what should we do before 2012.We should not wait 2012 to come but we have to do something to save our life and also save the environment.


Saturday, October 2, 2010

LOMPATAN APEX KE 2012

the leap to 2012!We should not avoid and do nothing to wait for the 2012 disaster to come infront of our eyes.All we need to do now is preparing ourself before the 2012 and also after the 2012.So,let's see how to make the leap!

USM is making transformation year by year and APEX journey start since year 2007.Foundation was being lay since 2007 and begin from this year(2010) USM start to deliver excellence after foundation was lay .As shown in the figure below:



Image from http://www.hbp.usm.my/1b/buluh/apexleap.htm

For better understanding of the whole progress,let's start from 2010 until after 2012.

The key elements are BIG’s Milestones- M0, M1, M2 dan M3

Milestone M0 ~OCTOBER 2010

Start with the October BIG Launch follow by the PONDOK production for 2012 disaster which was the bamboo dome produce by RUS101 students.

October BIG Launch:
1. USM BIG,

2. Traditional Toys and Games Museum,
3. Rumpun Buluh: Bamboo Research Village,
4. USM Bamboo Botanic Garden (Bambusetum).


These are the basic facilities in order to carry out researches and construction.


Example of the PONDOK (taken from www.google.com.my)

Besides,all schools and everyone should contribute to the pre-disaster preparation to make a better tomorrow.

Milestone M1~September 2011

Post disaster preparation-World Bamboo Conference will be held to generate a master plan.There will be systemic change in the economy and governance which would change scientifically include housing, education and schools, and the marketplace, to be ready in September 2012.Invention will be very useful when disaster.So,all the head and leaders of the country should co-operate to come out a plan that bring benefit to pupils.



Image from www.google.com


Milestone

M2~

September 2012: “How to Handle Global Disaster”


2012 is coming and final preparation should be done by this time.World 2012 Congregation will be held and share the Post-Disaster Alternative Development Master plan.


Milestone M3~21 December 2012 !


Image from http://www.the2012actuality.com/wp-content/uploads/2010/03/catastrophe_tsunami.jpg


The Polar Shift disaster happen by that day.Post-Disaster Alternative Development Masterplan to be implemented in the next 12 months if the disaster never happen.


If 2012 do not happen-

Between Milestones M3-M4

Here is the Implementation of Alternative Development Masterplan Period.Alternative development will be carry out and the development will be more details.Structure of primary, secondary and terteriary education was the example of development.

Friday, October 1, 2010

8A (Part) Assemble 7

After the lecture in the afternoon,our group section 4 meet and discussing how to assemble the part.


We decide to assemble it in the lecture room but we found that there are not enough space to do so.





Taking the screw to assemble outside lecture room.


So,we move to outside and screw the small part together.



Everyone working together to screw the part .


Part of the dome:



We screw the bamboo strut by the guide of X-MEN(male with green shirt)


However,the joint of the pipe and end of some bamboo strut still lose.So,we try to tighten it before we built part of the dome.


Moving in the part of the dome inside lecture hall.


Display it when USM discussion(2012 Domeday)

7 IBU Prototype-Part 4

We went there early in the morning to que up for polypipe curving but we still have to wait half hour for our turn!


Start to become not patient when waiting,he..



After curving the polypipe,we polish the polypipe before heat it.

Then,we cut the edge of the polypipe so that it become not very sharp.


Start to heat the polypipe using gas.Then,we press the both side of polypipe using the clamp so that the head side of polypipe become flat.


Become flat after pressing.




We labelled the cross 3.6cm from the top of polypipe to make a small hole on it using machine.


The product:


In the next morning,we continue our work again!!


Due to mistake,we measure the length of bamboo from the hole of the polypipe from end to end to makesure that it was in right length which was 2.284m.The mistake was we measure only the length of bamboo without considering the polypipe.



So,we shorten the length of the bamboo by cutting it.Thanks for Faris,Azwan and Safwan for helping us(girls)to cut the bamboo.


Then,we thin the bamboo again using parang and hammer.


Place the polypipe at the end of bamboo using hammer.


We found that the the bamboo was crack inside after we hammer it.So i tried to paste some pieces of bamboo on the cracking part using the glue borrow from bengkel as told by En.Rusli in the morning.







Paste bamboo pieces inside the cracking part.



We had done and this was the final product of my bamboo struts.